Work Update

Double vanity with carpenter.
Double vanity with carpenter.

The truck has been at the mechanic’s for over a week. Rumors of a reunion trickle in. Maybe we’ll see it again early next week. Other rumors of her possible demise were premature. She was leaking oil like a broken pipeline but it turned out to be a connector deep in the engine. So we hear. These last ten days Burt and I and the Olvis have been sharing our 24 year old Subaru and getting things done. Actually, it’s Jen’s Subaru. It was mine from 1998 until 2009. I gave it to Jen when we hit the road. Lucky for us it is a spare car in her corral now and we could borrow it for the summer. It has made for a much more interesting summer for me since I was more mobile than usual.

The job moves along and as usual for us, hitch itch is making us cranky. Some more than others. The kitchen is nearly complete. The backsplash was grouted today. The stove can be moved in now. The dishwasher and a faucet need to be installed. The faucet is electronic. You wave at it and wash your hands just like at Coscto. New skill set coming up.

Installing the tile backsplash.
Installing the tile backsplash.
More flooring
More flooring
Tub and magic wand.
Tub and magic wand.
Vanity.
Vanity. That drawer front was damaged. A new one is on the way.
Shower
Shower
Burt gets a little edgy at the end of the job.
Burt gets a little edgy at the end of the job.
Detail on backsplash.
Detail on backsplash.
I am tired but I am also sneaking up on it.
I am tired but I am also sneaking up on it. Sorting the lengths in advance makes the work go quicker.
facebooktwittergoogle_pluspinterest

Work Update

Heated Floor
Heated Floor. Job not done. That tail at the top was attached where wires were not crossed. Notice the cardboard bath tub model.

Last week I installed a heated floor. This was my third installation but we used a different style than the previous two jobs. This heated floor is built from one long loose wire that you weave between anchors to fill the desired floor space. The previous jobs used a mesh where the wire was embedded and the mesh had to be cut to fit the space without cutting the wire. It required solid engineering calculations and origami skills to determine how to fill an irregularly shaped space with a rectangular mat. The style we used this time was quite a bit easier to install but it left me feeling kind of empty. Anybody could have done this. I really enjoyed using my measuring and folding skills on the previous jobs.

As a side note, if you want one of these floors and aren’t planning a full remodel it will be a very pricey job. It’s not very difficult to install a heated floor if you’re down to the subfloor and have stud bays opened for the power and thermostat. It’s a whole can of worms to rip out existing flooring and not damage the walls and temporarily remove toilets and tubs (because all the flooring will have to be replaced) and route the wires up the walls to a thermostat, and then install and redo the floor. It’s also a high risk job. The wire needs to be kept intact and in position while the floor is retiled. If the wire gets cut the floor won’t heat then the whole thing has to be ripped out and started over.  It’s so risky there are current testers to use as you install to make sure there isn’t any unseen line break. Personally, if someone wanted me to install a heated floor in an existing bathroom I’d charge at least plumber’s wages. That’s $120 an hour here. On the other hand, if you’re a DIY homeowner and you are redoing your bathroom, I’d say go for it but skip the box store kits. Buy this style kit from an electrical wholesaler and plan ahead. At the start of the job you need to know where you’ll be sourcing power and placing the thermostat. If you forget this headaches will follow as you try to get wires up stud bays. And be very careful when you cover the wires with thinset.

The counters also came in this week. These are a cultured quartz. Manufactured stone gives a lovely, consistent appearance. Ground up rocks and pigments are mixed with polymer glues and then poured into forms. I prefer this more predictable finish. Granite tops always gave me the shivers. Ordering your dream kitchen from a 4″ x  4″ square that never shows the natural color and texture variations of a full counter is a high stakes game. I love how these tops complement the dark cabinets.

Undermount sink with half divider.
Undermount sink with half height divider. I like the square cornered sinks, too.
Counter install
Counter install.
This is a cultured stone. Quartz style.
This is a cultured stone. Quartz style. I really like it.
Installing a marble style tile.
Installing a marble style tile.