Actually it’s the end of Week 5

Pumper truck to the roof.
Pumper truck to the roof.

Here we are at what happens to be the end of week 5 of construction. The structure is complete. Next steps for our team of albaƱiles (masons) is the half wall on the roof deck and the start of the exterior plaster. Word is the interior scaffolding will remain in place as the roof concrete cures for two weeks. I just looked up the cure curves for concrete to refresh myself. Seven days is generally accepted as 70% strength under optimal temperatures and humidity. We’re pretty close to that here on the Tropic of Cancer, maybe just a little dry and too much day to night temperature swings, for a perfect cure but way ahead of the US right now. So two weeks is well within the margin of error to remove the forms.

The pour was uneventful but a little stressing for me. Our concrete was ordered from Cabo San Lucas. Two of the spinning Easter egg shaped trucks and a pumper truck came in stages but by the time the pumper was situated the concrete was two hours old. ASCE (American Society of Civil Engineering) says no truck over 1 1/2 hours old shall be accepted. I know from past experience that 2 hour trucks get poured but it’s not what you want to do. It was a very dry, difficult to work concrete that landed on our roof. Only time will tell if it’s adequate for the job. Most likely all is well and this is a case where ignorance would be bliss. I have no fears about the structural integrity but I do worry about the finish. Here, again, our location is an advantage. There is no freeze, therefore no thaw, and the concrete finish should not be heavily stressed.

On other fronts I was laid low by a severe bout of vertigo last week. It’s happened before and it’s never fun but this time I projectile vomited. Surprisingly easy to do when your inner ear isn’t working. The ear doctor hear ordered me onto a no salt diet. My ear seems to hurt less, and my fingers are skinnier. I guess I was retaining water. The vertigo is lessened but not gone. It might take weeks.

We have a show next week and we’ve been regularly practicing with our friend Priscila. Check us out on Valentine’s Day at Las Fuentes, 6 PM, Todos Santos. Love gone good and bad.

The roof with a skim coating of mortar.
The roof with a skim coating of mortar. The drainage bulge is visible.
Show at Las Fuetes on Valentine's Day.
Show at Las Fuetes on Valentine’s Day.
facebooktwittergoogle_pluspinterest

One thought on “Actually it’s the end of Week 5”

  1. so both curing concrete and curing vertigo remain as concerns, the latter more than the former. As for Valentine’s day, sorry, I won’t be there — but break a leg apiece anyway!

Leave a Reply

Your email address will not be published.

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>